Construction sites can generate large volumes of waste. When different materials are mixed together, recyclable resources can become harder to recover.
A practical approach to construction waste management starts before work begins. Identifying likely waste streams, planning where materials will go and arranging suitable collection services can help construction businesses recover more materials and support recycling throughout a project.
Waste management should be considered alongside the construction schedule.
Before work begins, identify the types and approximate volumes of waste the project is likely to produce. Consider how much waste different stages of the project may generate and whether collection requirements are likely to change as work progresses.
Consider which materials can be kept separate, which will need dedicated bins and whether any materials require specialist handling. Planning where bins will be positioned is also important. They should be convenient for workers without obstructing machinery, deliveries or other site activities.
Separating suitable materials before they become mixed with general waste can support better waste recovery.
Depending on the project, separate waste streams may include concrete and masonry, timber, metals, cardboard and other building materials. Keeping materials apart can reduce contamination and make it easier for suitable resources to move into recycling or recovery pathways.
Not every project will have enough space or volume for separate bins for every material. Where separation is practical, however, it can improve the potential for recovery.
Workers should also know what belongs in each bin. Clear instructions can help prevent recyclable materials from being placed in the wrong waste stream.
The right bin depends on the type, volume and physical characteristics of the waste being generated.
A small renovation may require a builders’ skip, while a larger construction or demolition project could need bulk waste skips and more frequent collections. Richmond Waste provides builders’ and bulk waste skips in different sizes, with delivery and collection options to suit project requirements.
Consider how quickly each waste stream will accumulate and whether collection vehicles can safely access the bins. A bin that is too small may fill before the next collection, while poor placement can make it difficult for workers to use.
Waste volumes can change significantly as a project moves from demolition to construction and finishing work.
Rather than relying on the same collection schedule throughout the project, consider when waste volumes are likely to increase. A demolition stage may require more frequent removal than later stages of a build.
Arranging collections around these changes can help prevent bins from becoming overloaded and reduce the need to store waste elsewhere on site. Richmond Waste offers frequency-based and ad hoc collection options, allowing services to be adjusted to project requirements.
The waste management approach can also be reviewed as work progresses. If one material is being generated in much larger quantities than expected, the bin or collection service may need to be adjusted.
Not everything generated on a construction site can be handled through ordinary waste recovery.
Materials such as asbestos and certain hazardous wastes require specific handling, transportation and disposal arrangements. They should not be placed in a standard construction skip. Richmond Waste provides advice regarding asbestos and hazardous waste as part of our services.
Identifying these materials before work begins is important. If they are mixed with recoverable construction materials, additional sorting may be required and the recovery process can become more complicated.
When in doubt, check with your waste provider about what can be placed in each bin.
Many construction materials are suitable for recovery when they are appropriately separated and handled correctly on site.
What happens to recovered materials depends on their condition, contamination levels and the facilities available. Materials that meet the relevant requirements can be processed for recycling or directed towards reuse where appropriate.
Richmond Waste is affiliated with the Alstonville Transfer Station, where mixed construction and demolition materials can be sorted alongside other waste streams to support recovery and recycling.
Improving construction waste recovery starts with making waste part of the project plan. Identify the materials likely to be generated, separate suitable waste streams where practical, choose bins that match the job and arrange collections around the stages of work.
For those in the Northern Rivers, Richmond Waste provides construction and demolition waste recovery, skip bin and collection services across areas including Lismore, Ballina, Byron, Kyogle and Richmond Valley.
If you’re planning a building, renovation or demolition project, contact Richmond Waste to discuss the waste streams your project is likely to produce and the collection and recovery options available to help you manage your waste effectively on site.